Lakewood High School Stadium
Every year, we select and recognize unique projects based on application methods, sustainable construction, and cross-business collaboration. As part of the 2022 Project of the Year program, we are pleased to recognize the Lakewood High School Stadium in Atlanta, GA with the 2022 Project of the Year award.
The project included a complete restoration of the 10,000-seat precast stadium - horizontal and vertical
concrete repair, corrosion mitigation,
pedestrian deck coating, pre-textured pedestrian coatings, preformed expansion joints,
joint sealant removal and replacement, vertical anti-carbonation coatings, vertical
hydrophobic wall coatings, vertical
water repellents, negative side waterproofing, EIFS repair, and epoxy floor coatings.
Master Builders Solutions is the only manufacturer that offered a comprehensive, compatible, and holistic solution combined with the local team’s knowledge and expertise. Congratulations to the team!
Master Builders Solutions Team: Keith C. Howard CSI, CCPR-LEED AP, Keith Batchelor, Jay Charney and Brittany Hill CSI, CDT
Engineer:
Terracon
Owner:
Atlanta Public Schools
Construction Management:
Brown & Root Industrial Services, LLC
Contractor:
Everclear Enterprises, Inc.